Skip to content

Bump org.glassfish.grizzly:grizzly-http-server from 4.0.2 to 5.0.0 #2424

Bump org.glassfish.grizzly:grizzly-http-server from 4.0.2 to 5.0.0

Bump org.glassfish.grizzly:grizzly-http-server from 4.0.2 to 5.0.0 #2424

Status Failure
Total duration 1h 2m 18s
Artifacts

pull-request-build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-latest, 17)
Process completed with exit code 1.
build (ubuntu-latest, 21)
The strategy configuration was canceled because "build.ubuntu-latest_17" failed
build (ubuntu-latest, 21)
The operation was canceled.
build (windows-latest, 17)
The strategy configuration was canceled because "build.ubuntu-latest_17" failed
build (windows-latest, 17)
The operation was canceled.
build (windows-latest, 21)
The strategy configuration was canceled because "build.ubuntu-latest_17" failed
build (windows-latest, 21)
The operation was canceled.