feat: process-per-connection architecture with full proxy support #305
erlang.yml
on: pull_request
FreeBSD 14.2 OTP-28
3m 27s
Matrix: legacy
Matrix: linux-arm64
Matrix: linux-quic
Matrix: linux
Matrix: macos
Annotations
10 errors and 1 warning
|
Linux ARM64 OTP-27.2
Process completed with exit code 1.
|
|
macOS ARM64 OTP-27
Process completed with exit code 2.
|
|
Linux x86_64 OTP-28.0
Process completed with exit code 139.
|
|
Linux x86_64 OTP-24.3 (legacy)
Process completed with exit code 139.
|
|
Linux x86_64 OTP-27.2
The strategy configuration was canceled because "linux._28_0_3_24_0" failed
|
|
Linux x86_64 OTP-27.2
The operation was canceled.
|
|
Linux x86_64 OTP-25.3 (legacy)
The strategy configuration was canceled because "legacy._24_3_3_22_1" failed
|
|
Linux x86_64 OTP-25.3 (legacy)
The operation was canceled.
|
|
Linux x86_64 OTP-26.2 (legacy)
The strategy configuration was canceled because "legacy._24_3_3_22_1" failed
|
|
Linux x86_64 OTP-26.2 (legacy)
The operation was canceled.
|
|
macOS ARM64 OTP-27
`$HOMEBREW_NO_INSTALLED_DEPENDENTS_CHECK` is set: not checking for outdated
dependents or dependents with broken linkage!
|