Account for changes in fixture dependencies properly #8286
Annotations
6 errors
|
build (windows-py314)
Canceling since a higher priority waiting request for test-refs/pull/14104/merge exists
|
|
build (windows-py314)
The operation was canceled.
|
|
build (ubuntu-py310-lsof-numpy-pexpect)
Canceling since a higher priority waiting request for test-refs/pull/14104/merge exists
|
|
build (ubuntu-py310-lsof-numpy-pexpect)
The operation was canceled.
|
|
check
Process completed with exit code 1.
|
|
test
Canceling since a higher priority waiting request for test-refs/pull/14104/merge exists
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
Package Metadata
|
2.83 KB |
sha256:7ce362a5950a62d874f7021c253e20390ee1834009746770423a460c7cfd796d
|
|
|
Packages
|
1.86 MB |
sha256:dd69dfbb63e3308f7ce9c3b3fd229a37737f15693e9f9f35e7b327e19e4ec651
|
|
|
PyPI README
|
2.12 KB |
sha256:5744383a68e540d5701b9849f430ef95cdd0b7a7ed7a5844a212a34e0027a75a
|
|